SPEED OF ERECTION CUPLOCK
Provides major savings in erection and dismantling times thus minimizing on site cost. It can be erected 75% faster than traditional scaffoldings. When not in use, its modular constructions ensure minimal space requirements for storage.
SIMPLICITY AND STRENGTH
The success of cuplock lies in the node point or fastening method. Four horizontal can be fastened at one time making a very rigid connection. The horizontal bear directly on the verticals and are firmly clamped by the action of the cup. There are no loose parts to lose. The rigid node point allows for high horizontal loads experienced with a 57kN leg load.
VERSATALITY
When investing in equipment’s it must be as versatile as possible. Cuplock can be erected for straight, curved and circular configuration for both access and support, and for independent and mobile towers.
DURABILITY
With no loose parts and with corrosion protection it can be easily stored and maintained. Designed to be tough, cuplock is highly resistance to damage. When not in use, it’s modular construction ensure minimal space requirement for storage.
STANDARD |
---|
Sizes Available |
1.0 meter |
1.5 meter |
2.0 meter |
2.5 meter |
3.0 meter |
LEDGER |
---|
Sizes Available |
1.0 meter |
1.5 meter |